Staff Login

PROJECT MANAGEMENT

COOLING TOWER REFURBISHMENT

Cooling tower refurbishment is an excellent and cost-effective solution that extends the life, performance, and efficiency of the existing cooling towers without building a new one. Our team is proficient with the best practices in the industry and adopts cutting-edge technologies to provide detailed planning for cooling tower refurbishment with a clear scope of work, pre-and post-testing, safety, careful selection of material, experienced inspection, and planning for future maintenance. We reconstruct and deliver cooling towers successfully with returns in cooling capacity, structural integrity, and longevity of the cooling tower.

 

REFURBISHMENT PROCESSES:

• Pre-inspection of the Cooling Tower system
• Replacement of infill
• Steel structure refurbishment by sanding and grinding process
• Corroded parts replacement
• Cold water basin surface repair work by sanding and grinding process
• Structure fiberglass layer, lamination, and painting work
• Cold water basin waterproofing
• Hot water basin and its hardware, cover replacement
• Remove and replace new spiral target crossflow nozzles
• Replace FRP (Fiberglass Reinforced Panel)
• Overhauling Gear Reducer with necessary parts replacement
• Carry out motor alignment after overhaul c/w necessary testing and commissioning
• Replace faulty the inlet and outlet valve with new set c/w necessary testing and commissioning
• To make good of the corroded perimeter handrail c/w painting
• Replace the internal walking platform and handrail
• Replace the electrical cable containments within the cooling tower
• Repaint the inlet and outlet condenser water pipeline
• Post inspection in all the required parameters
• Testing and commissioning

Check out our project reference video here:

>

Call us at +65 6747 1527

Click for Contact Form

Share your concerns and our consultants will be in touch right away

Open chat
Got a query?
Hi!
We Solve Complex Engineering Challenges. How can we help you?